Interconnection Process
Expedite the entire process for interconnection impact studies – from data integration to model preparation, technical screening, and updates.

envelio solutions by the numbers
of customers running daily or weekly full grid model refreshes
stations and substations on our platform
modeled interconnection points
Save time and resources
Reduce the needed engineering resources from weeks to days. Your engineers can start from where it really matters – preparation of the model, creation of possible variants, and power-flow calculations are already run automatically in the background.
For smaller, residential applications, even full automation can be implemented based on your defined criteria and thresholds.

Always up-to-date calculations
Thanks to the Grid Hub, no network model preparation is needed at all. The impact studies are based on the current model, including already reserved interconnections and planned investments from your queue.
Your engineers have constant access to the most current version of your grid model, enabling them to run as many impact studies as needed throughout the interconnection project lifecycle. Planned network updates are automatically considered ensuring consistency across the queue.

Handle increased workload with existing staff
Automate routine tasks and streamline workflows to manage a higher volume of interconnection applications without additional staffing.
Adopt a centralized approach to manage and track all interconnections from start to finish, improving visibility and coordination across your teams.


Case study: Accelerated processing of interconnection requests at Elektrilevi

Case study: Introducing a POI self-checker for end customers at E.DIS

Case study: Automation and acceleration of interconnection impact studies at Syna
Contact us
Let’s get in touch and check how out solutions can help you optimize and improve your grid planning processes.
Contact person
Luigi Montana
CEO, envelio Inc.

envelio Inc.
53 State Street
Suite 500
Boston, MA 02109